Quick Start Guide

Get up and running in 10 minutes.

1. Sign In

Navigate to your Ridgeline instance and sign in with your email and password. If you don’t have an account, ask your admin to invite you from Admin > Users.

Forgot your password? Click Forgot password on the login page to receive a reset link by email.

2. Explore the Dashboard

After signing in, you land on the dashboard. It shows:

Use the left navigation to move between modules: Sites, Campaigns, Risks, and Projections.

3. Browse Your Sites

Click Sites in the navigation. The sites list shows every wind site in your portfolio with:

Click any site row to open its detail page.

4. View a Site’s Details

The site detail page has tabs:

TabWhat It Shows
OverviewLocation, capacity, SCADA metadata, integration status
TurbinesAll turbines at the site with specs and component details
Work OrdersMaintenance work orders linked to this site
AgreementsService agreements (OEM FSA, ISP, self-perform)
Tag MappingSCADA tag-to-canonical signal mapping

5. Add Your First Site

  1. Click + New Site from the sites list.
  2. Fill in the required fields: name, location, state, ISO/RTO, capacity, turbine count, and OEM.
  3. Add SCADA system details (system type, historian, data frequency).
  4. Click Create Site.

Your new site starts in Pending status. Add turbines and agreements, then validate integration readiness to move it forward.

Tip — For a detailed walkthrough of the full onboarding process, see How-To: Onboard a New Wind Site.

6. Add Turbines

  1. Open your site’s detail page.
  2. Click the Turbines tab, then + Add Turbine.
  3. Enter turbine ID, model, serial number, hub height, rotor diameter, GPS coordinates, and commission date.
  4. Click Create Turbine.

Repeat for each turbine, or ask your admin about bulk import options.

7. Start a DD Campaign

If you’re evaluating a site for acquisition:

  1. Go to Campaigns > + New Campaign.
  2. Name the campaign, select the target site, set the campaign type and stage.
  3. Click Create Campaign.
  4. Add component assessments from the campaign detail page.
  5. Use the Data Quality Scorecard to track completeness.

8. Check the Risk Register

Go to Risks to see all identified risks. Filter by site, severity, status, or category. Click Heat Map for a visual probability-impact matrix.

9. Model O&M Costs

Go to Projections > New Projection to create a cost model. Choose from Annual Budget, DD Pre-Acquisition, or Long-Term Plan. Ridgeline auto-generates line items from industry baselines that you can override with site-specific data.

What’s Next?